TYPICAL FLOOR PLAN
FLAT-A
FLAT-B
FLAT-C
FLAT-D
FLAT-E
STRUCTURE
  • Framed RCC Structure.
  • Solid cement block masonary walls.
  • Cement plastering for all areas.
WINDOWS AND VENTILATORS
  • Powder coated aluminium windows & ventilators With M.S..Grills
DOORS
  • FRONT DOOR – hard wood frame outside teak
  • covered and teak wood panelled door for eachflat.
  • General door frames hard wood and jacson or equivalent doors.
  • For bathroom Sintex or equivalent single panel with frame.
  • All doors provided with locks except bathroom.
FLOORING & WALL CLADDING
  • Vitrified 2'× 2' tiles for flat. All common areas and staircase with granite tiles.
  • Light coloured ceramic tile flooring for bathrooms.
  • Light coloured ceramic tile wall dadoing upto 210 cm height in bathrooms.
  • Light coloured ceramic tile wall dadoing upto 40 cm height from kitchen work top slab.
WALL FINISHING
  • Putty finished walls for interiors with two coats of emultion paint.
  • Exterior grade emultion paint for exteriors.
WATER SUPPLY
  • Sump tank and overhead tank for water storage.
  • Kerala water authority water supply with additional well/Bore well supply through pumping.
ELECTRICITY SUPPLY
  • KSEB electric supply with separate metering.
  • Generator backup For lift and common area light points.
TELEPHONE
  • 1 Telephone point living.
CABLE TV
  • 1 cable TV connection point in living.
KITCHEN
  • Polished granite slab finish above RCC kitchen top slab.
BATHROOMS
  • Light coloured European cascade closet on each bathroom.
  • Medium weight chorium plated bathroom taps and valves.
  • Geyser provision in all bathrooms.
  • Plumbing using ISI grade pipes and accessoriers.
SEWAGE
  • Sewage treatment plant approved by the pollution control board.
DINNING ROOM WASH BASIN
  • Washbasin coloured with form flow tap.
ELECTRIC SUPPLY POINTS
ROOM 5A 15A FAN LIGHT A/c POINT
Living room Cum Dinning room 4 Nos. 1 No. 2 Nos. 4 Nos.
Kitchen &Work area 4 Nos. 1 No. 1 No. 2 Nos.
4 Nos. 1 No. 1 No. 1 No.
Bath rooms 1 No. 1,20,000.00 1 No. 2 Nos. 1 Point in each flat
Balcony 1 No.
  • MCBS and ELCB in Main Switch Board.
  • Modular switches for all rooms.
  • Wiring work using ISI grade wires.
FACILITIES WITH ADDITIONAL PAYMENT
  • Additional light/fan/5A plug/15 plug/telephone /CTV/A/c points in each room.
  • Granite slab flooring.
  • Kitchen furnishing works.
  • Bedroom wardrobe works.
  • Living room/dining room Racks.
  • Covered / uncovered car parking.
  • 3.5 kms from Thrissur Round.
  • 3.5 kms from Thrissur Round.
  • Easily accessible transportation.
  • Home Loan Assistance.
  • Airport 50 kms.
  • Railway Station 2 kms.
Particulars A B C D E
Rate : Rs./ Sq:Ft 2500.00 2500.00 2500.00 2500.00 2500.00
Total Area (Sq.Ft.) 1314 1317 1006 1188 1179
Cost of Construction of FLAT
(including land cost-Rs.1 Lakh)
3285000 3292500 2515000 2970000 2947500
CAR Parking Facility 100000 100000 100000 100000 100000
Maintenance Fund 50000 50000 50000 50000 50000
For Electricity Connection 50000 50000 50000 50000 50000
TOTAL [A] : 3485000 3492500 2715000 3170000 3147500
Other Taxes & Registration Charges:*
Vat (3.03% on Cost of construction+ car park)
99536 99763 76205 89991 89309
Service Tax (4.12%) 135342 135651 103618 122364 121437
Registration cost..
Property Tax & One Time Building Tax
10000 10000 10000 10000 10000
TOTAL [B] : 244878 245414 189823 222355 220746
GRAND TOTAL [A+B] : 3729878 3737914 2904823 3392355 3368246

PAYMENT SCHEDULE

Instalment No. Particulars Payment Procedure
1st On Booking of the Apartment 20% of TOTAL COST
2nd On or before completion of Plinth Level 20% of TOTAL COST
3rd On completion of Main Concrete Structure 20% of TOTAL COST
4th On completion of Plastering inside 10% of TOTAL COST
5th On completion of Plastering outside & Tile works 10% of TOTAL COST
6th On completion of Painting work 8% of TOTAL COST
7th On completion of Electrical & Plumbing works. 5% of TOTAL COST
8th On completion of Bathroom fittings & Door fittings. 5% of TOTAL COST
Last On or before handing over the KEY 2% of TOTAL COST/ (BALANCE AMT.)